Gullen Range Wind Farm

The Gullen Range Wind Farm project was located 40km South West of Goulburn, NSW. The 165MW wind farm consisted of 56 2.5MW Wind Turbine Generators and 17 1.5MW WTG’s CATCON’s scope of work consisted of; 73 no WTG’s bases poured in Pomerroy, Bannister and Gurrundah section of works, WTG ancillary/stair concrete footings to WTG’s, concrete […]

Continue reading

Snowtown II Wind Farm

The Snowtown Wind Farm Stage II project was located approximately 150km North of Adelaide in South Australia. CATCON was contracted to construct the 90 turbine foundations, hardstands, road network, site compound and substation and control centre civil works. A mix of rock anchor (130m3) and gravity (320m3) footings were used depending on the requirements for […]

Continue reading

Woodlawn Wind Farm

The Woodlawn Wind Farm project involved the Design and construction of Wind Turbine Generator (WTG’s) gravity and rock anchor foundations, access roads and adjoining crane hardstands for the 23 WTG wind farm located in New South Wales. Transformer kiosks were supplied and installed as precast items rather than conventional wet pours. Ancillary features constructed concurrently […]

Continue reading

Cullerin Range Wind Farm

Located 35km West of Goulbourn (NSW), the Cullerin Range Wind Farm Project was a balance of plant contract carried out in consortium with Areva T&D. The project consisted of the design and construction of gravity concrete turbine bases, road and hardstand network, installation of cable network, construction of the civil works associated with a substation […]

Continue reading

Gunning Wind Farm

CATCON was contracted to construct 31 Wind Turbine Generator (WTG) foundations, access roads and adjoining crane hardstands. Ancillary features associated with such were concrete drainage pipes/headwalls, cattle grids, access gates and final rehabilitation (seeding). Works also included the installation of High Voltage (HV) and Optic Fibre Reticulation cabling, in line joints, terminations within WTG’s and […]

Continue reading

Collgar Wind Farm

The Collgar Wind Farm scope of works for CATCON included the Geotechnical investigation, design and construction of 111 concrete wind turbine foundations and a 74 km road and hardstand network. The scope also included construction and maintenance of the project offices and amenities and all satellite facilities for 200 people. The Collgar site is located […]

Continue reading

Waterloo Wind Farm

The Waterloo Wind Farm is located 120kms North of Adelaide, South Australia. CATCON were contracted to design & construct 37 V90 Turbine footings, hardstands, roads, sub-station and control buildings. The terrain comprised of steep and narrow ridges and rock strata which required blasting and a host of machinery including; D9 Dozers, 80t Excavator, 30tn Excavators, […]

Continue reading

Lake Bonney Wind Farm – Stage 2

The construction of the civil and electrical works associated with the Lake Bonney Stage 2 Wind Farm, on a site 11km long and 1 km wide with 53 wind turbines, was a Joint Venture between CATCON with Areva. Lake Bonney represents our firm’s milestone involvement on a large scale wind power resource energy project. 350m3 […]

Continue reading