Clayton Regulator

CATCON were contracted to excavate and remove the Clayton Regulator (located 90km South of Adelaide, South Australia), an earth dam previously installed in the Murray River from the excavation of the Hindmarsh Marina. This was installed during a drought to ensure the Acid Sulphate Soils (ASS) of the river bed were not uncovered. With the […]

Continue reading