Aldinga Waste Water Treatment Plant

The Aldinga Waste Water Treatment ‘B’ Plant project was located approximately 40km South of Adelaide. The ‘B’ Plant expansion works included 2300m3 of Structural Concrete constructing; Inlet Structure, 2 x Clarifiers, Oxidization Ditch, Chem Dosing and Daft Plants, Chlorine Contact System, RAS/WAS System and various other structures. 30,000m3 Bulk Earthworks included pond construction and all […]

Continue reading

SACBH – Keith Storage Facility

The two 22,500 Tonne Storage Sheds located at Keith were constructed as a grain storage and handling facility at Keith for SACBH. The sheds were located adjacent to existing bunkers and have a total capacity of approximately 45,000 tonnes segregated into 5 parcels each. The work by CATCON involved earthworks, construction platforms, concrete walls, extensive […]

Continue reading

Pelican Point Power Station

CATCON were contracted to complete civil works associated with the 500MW combined cycle power  located at Pelican Point, Outer Harbour, South Australia. CACTON provided 6,000m3 of structural concrete elements, including; steam turbine foundation, gas turbine foundations, transformer blast walls and associated structures. The 8 month project involved adhering to a very tight programme and interfacing […]

Continue reading

Newport Quays – Stage 2

CATCON are proud to be involved with the Newport Quays Project for the Brookfield Multiplex / Urban Construction Joint Venture. During Stage 2A, CATCON provided all infrastructure works, including the construction of the marina, road & streetscape works, underground services and lighting. The centrepiece of Stage 2A for CATCON was the exclusive multi-berth marina, constructed […]

Continue reading

City Skate Park

City Skate Park – North Terrace West End as Adelaide’s skate board and cycle sport park is very popular with young people and represents an excellent environmentally sound solution for the sport. Skate park was constructed in 2 stages within tight program restraints. Base formation required detailed excavation work and the handling of contaminated soils […]

Continue reading

King William Street Upgrade

Completed in 4 stages, the King William Street Upgrade works for the Adelaide City Council consisted of; the supply and installation of new electrical and communication conduit banks, stormwater drainage system, new gas main service, construction of new kerbs, resupply pavements and construction of new slate paving. The slate pavers measured 500x500mm and were laid […]

Continue reading

Container Terminal Wharf

Outer Harbour’s history was previously known for a large wharf and overseas liner passenger terminal. The majority of large scale shipping operation at Outer Harbour today is at No. 7 Wharf with the export of vehicles and the handling of shipping containers. CATCON constructed the container wharf as a reinforced concrete deck at No.7 Container […]

Continue reading

Torrens Island Power Station

The “Quarantine Island” Power Station is located on Torrens Island, Adelaide, South Australia. CATCON were contracted by Alstom Power to supply civil works for the project, including; earthworks, construction of concrete structures, service installations and road works. While constructing the 3000m3 concrete elements – including 4 turbine basses – special care and consideration were required […]

Continue reading

Cullerin Range Wind Farm

Located 35km West of Goulbourn (NSW), the Cullerin Range Wind Farm Project was a balance of plant contract carried out in consortium with Areva T&D. The project consisted of the design and construction of gravity concrete turbine bases, road and hardstand network, installation of cable network, construction of the civil works associated with a substation […]

Continue reading

Condamine Power Station

CATCON were contracted to supply in-ground structures for all associated plant for the 2 x coal seam gas fired turbines. Additionally all in-ground services provision were supplied and installed by CATCON. System formwork was used for all Gas Turbine Blocks, Steam Turbine Block, HRSG and Diverters. Conventional formwork used for cooling tower, transformer bays, pits […]

Continue reading