Port Augusta Renewable Energy Park

The Port Augusta Renewable Energy Park (PAREP) is a combined wind and solar photovoltaic (PV) farm located approximately 8 km south-east of Port Augusta in South Australia. It occupies approximately 5,400 hectares of land running from Port Paterson in the north, to Winninowie in the south and spanning the A1 Augusta Highway. The PAREP is […]

Continue reading

Biala Wind Farm

Located approximately 250km South West of Sydney, the Biala Wind Farm was a 31 x 4.2MW WTG project completed for client BJCE. The Wind Farm has an installed capacity of approximately 110MW producing enough electricity to power 46,000 homes on an average day of wind. CATCON were contracted to perform the CBOP works including; geotechnical […]

Continue reading

Coopers Gap Wind Farm

The Coopers Gap Wind Farm is located near Cooranga North, Queensland, approximately 250km West of Brisbane. The project consisted of 123 GE  3.6MW/3.8MW turbines for client AGL and at the time of completion in 2019 was the largest wind farm in Australia. CATCON were contracted in an EPC Consortium agreement with GE for the engineering […]

Continue reading

Bodangora Wind Farm

The Bodangora Wind Farm consists of 33 Wind Turbine Generators (WTGs) with a generation capacity of 113.2MW, a Wind Farm Substation, and an operation and maintenance (O&M) building. It is located on farmland northwest of the township of Bodangora, and approximately 41km ESE of Dubbo in NSW. CATCON partnered with GE under an EPC Contract […]

Continue reading

Silverton Wind Farm

The Silverton Wind Farm is located approximately 20km North-West of Broken Hill in New South Wales, near the South Australian border. CATCON joint ventured with GE to supply and construct 80km of road, 58 WTG foundations equating to 40,000m3 of concrete and erection & commission 58 3.4MW GE Wind Turbine Generators as well as the […]

Continue reading

Mt Emerald Wind Farm

The Mt Emerald Wind Farm is located approximately 100km West of Cairns in Queensland. CATCON – in BoP consortium with CPP – were contracted by client Vestas to construct; roads, hardstands, sub-station, WTG foundations, HV cabling and the O&M facility. The rugged and rocky terrain containing extreme grades made Mt Emerald one of the most […]

Continue reading

Willogoleche Wind Farm

The Willogoleche Wind Farm is located in the Mid-North region of South Australia, approximately 200km North of Adelaide. CATCON and EPC partners GE were contracted by Engie to design and construct the 32 WTG Wind Farm. Works included earthworks, road works, WTG concrete foundations, cabling & electrical works, O&M facility construction as well as transportation […]

Continue reading

Badgingarra Wind Farm

Badgingarra Wind Farm is located approximately 200km North of Perth, Western Australia. CATCON and consortium partner CPP were contracted to construct the BoP Civil & Structural Package, including, 37 WTG sites, road network, HV cabling, on-site batch plant as well as the Substation and Operations & Maintenance Building. Works were completed within the 8 month […]

Continue reading

Hornsdale Wind Farm

The Hornsdale Wind Farm is located approximately 200km North of Adelaide, South Australia. CATCON was contracted to perform Balance of Plant civil works Hornsdale Windfarm on Stages 1, 2 & 3. Works included; design & construction of wind turbine foundations, crane hardstands, laydown areas, roads, foundation interface grouting, fencing, substation benches & Operation and Maintenance […]

Continue reading

Coonooer Bridge Wind Farm

Located in regional Victoria, this 6 turbine Wind Farm (including Switchyard) was constructed for client and turbine supplier Vestas. The 8 month project involved construction of roads, hardstands, turbine foundations and civil works for the associated switchyard. The remote and rocky location provided a challenging working environment required blasting to break down the medium to […]

Continue reading