Torrens Island Power Station

The “Quarantine Island” Power Station is located on Torrens Island, Adelaide, South Australia. CATCON were contracted by Alstom Power to supply civil works for the project, including; earthworks, construction of concrete structures, service installations and road works. While constructing the 3000m3 concrete elements – including 4 turbine basses – special care and consideration were required […]

Continue reading

Cullerin Range Wind Farm

Located 35km West of Goulbourn (NSW), the Cullerin Range Wind Farm Project was a balance of plant contract carried out in consortium with Areva T&D. The project consisted of the design and construction of gravity concrete turbine bases, road and hardstand network, installation of cable network, construction of the civil works associated with a substation […]

Continue reading

Condamine Power Station

CATCON were contracted to supply in-ground structures for all associated plant for the 2 x coal seam gas fired turbines. Additionally all in-ground services provision were supplied and installed by CATCON. System formwork was used for all Gas Turbine Blocks, Steam Turbine Block, HRSG and Diverters. Conventional formwork used for cooling tower, transformer bays, pits […]

Continue reading

Pt Augusta Powerplant Concrete Remediation

When the ‘Playford B’ Coal Fired Power Station located at Pt Augusta (South Australia) required a thorough refurbishment, CATCON won the $4.5 million dollar contract to complete all associated civil works, including; construction of new concrete structures, retaining walls, piling, structural steel work and repair to existing concrete structures. Working within the partially operational power […]

Continue reading

Colongra Gas Turbines

The Colongra Gas Turbine project is located at Lake Munmorah Power Station near Doyalson – approximately 100km North of Sydney. The facility consists of 4 x GT13E2 gas turbines, generating 660MW of electricity, enough to power 400,000+ homes. During the 12 month construction project CATCON were contracted by head contractor Alstom Ltd under the direction […]

Continue reading

Douglas Mine Water Supply

Located near Balmoral, Western Victoria, Iluka Resources Douglas Mineral Sands Mine required a water pipeline to assist in their mining operations. CATCON’s involvement in the 21km, 450mm D.I.C.L pipeline involved; stringing, wrapping, excavation, bedding, laying, appurtenances and backfilling activities. Two pipeline river crossings were needed and a specialist construction team consisting of approximately 35 people […]

Continue reading

Gunning Wind Farm

CATCON was contracted to construct 31 Wind Turbine Generator (WTG) foundations, access roads and adjoining crane hardstands. Ancillary features associated with such were concrete drainage pipes/headwalls, cattle grids, access gates and final rehabilitation (seeding). Works also included the installation of High Voltage (HV) and Optic Fibre Reticulation cabling, in line joints, terminations within WTG’s and […]

Continue reading

Willunga Basin Pipeline

The 20km Willunga Basin Pipeline was constructed by CATCON for the South Australian Department for Transport, Energy & Infrastructure to provide a waste water solution for the Willunga Basin area south of Adelaide. The 450MPVC pressure pipeline system took 9 months to complete and consists of; 2 pump stations, appurtenances, lined water storage facility and […]

Continue reading

NT Subdivisions

CATCON have been undertaking works to The Chase and The Fairway Waters estates for Delfin Lend Lease at Darwin – Northern Territory. The subdivisional works have involved; earthworks, road works, construction of sewer mains, water mains, stormwater drainage pipework and CST works. CATCON continues involvement in this project and other major residential developments around Australia. […]

Continue reading

Collgar Wind Farm

The Collgar Wind Farm scope of works for CATCON included the Geotechnical investigation, design and construction of 111 concrete wind turbine foundations and a 74 km road and hardstand network. The scope also included construction and maintenance of the project offices and amenities and all satellite facilities for 200 people. The Collgar site is located […]