Yurralyi Maya GTG

Yurralyi Maya GTG 8 Power Station is a gas fired open cycle power generation plant located just outside Karratha in WA. CATCON undertook the following construction works on the project; construction off all reinforced concrete structures, installation, testing and commissioning of all underground services including water & fire ring mains, compressed air and electrical conduits […]

Continue reading

Barcaldine Solar Farm

CATCON were engaged by Green Light Contractors (GLC) to construct the civil works, piles, mechanical, and PV Modules for a 20 MWAC (25 MWDCp) Solar PV Project approximately 4 kms East of Barcaldine (central QLD). The Project consists of 25 MWDCp of single axis tracking arrays over an area of approximately 298 Ha. It will […]

Continue reading

Hornsdale Wind Farm

The Hornsdale Wind Farm is located approximately 200km North of Adelaide, South Australia. CATCON was contracted to perform Balance of Plant civil works Hornsdale Windfarm on Stages 1, 2 & 3. Works included; design & construction of wind turbine foundations, crane hardstands, laydown areas, roads, foundation interface grouting, fencing, substation benches & Operation and Maintenance […]

Continue reading

Moree Solar Farm

The 56MW Moree Solar Farm is located in Northern NSW. CATCON was contracted to perform all civil and mechanical works on the 11 month project including; establishment of site compound, upgrade of external road in accordance with the Local Shire requirements, security fencing, construction of all internal roads, construction of substation bench, installation of 32,000 […]

Continue reading

Coonooer Bridge Wind Farm

Located in regional Victoria, this 6 turbine Wind Farm (including Switchyard) was constructed for client and turbine supplier Vestas. The 8 month project involved construction of roads, hardstands, turbine foundations and civil works for the associated switchyard. The remote and rocky location provided a challenging working environment required blasting to break down the medium to […]

Continue reading

Royalla Solar Farm

Royalla Solar Farm project is a solar PV generating facility located near Canberra (ACT). The project involved the construction and commissioning of a 20MWac photovoltaic array plus the associated connections to the ACT power grid and other ancillary infrastructure. CATCON were engaged under a civil, mechanical and electrical scope of works construct only package, responsible […]

Continue reading

Gullen Range Wind Farm

The Gullen Range Wind Farm project was located 40km South West of Goulburn, NSW. The 165MW wind farm consisted of 56 2.5MW Wind Turbine Generators and 17 1.5MW WTG’s CATCON’s scope of work consisted of; 73 no WTG’s bases poured in Pomerroy, Bannister and Gurrundah section of works, WTG ancillary/stair concrete footings to WTG’s, concrete […]

Continue reading

Snowtown II Wind Farm

The Snowtown Wind Farm Stage II project was located approximately 150km North of Adelaide in South Australia. CATCON was contracted to construct the 90 turbine foundations, hardstands, road network, site compound and substation and control centre civil works. A mix of rock anchor (130m3) and gravity (320m3) footings were used depending on the requirements for […]

Continue reading

Woodlawn Wind Farm

The Woodlawn Wind Farm project involved the Design and construction of Wind Turbine Generator (WTG’s) gravity and rock anchor foundations, access roads and adjoining crane hardstands for the 23 WTG wind farm located in New South Wales. Transformer kiosks were supplied and installed as precast items rather than conventional wet pours. Ancillary features constructed concurrently […]

Continue reading

Pelican Point Power Station

CATCON were contracted to complete civil works associated with the 500MW combined cycle power  located at Pelican Point, Outer Harbour, South Australia. CACTON provided 6,000m3 of structural concrete elements, including; steam turbine foundation, gas turbine foundations, transformer blast walls and associated structures. The 8 month project involved adhering to a very tight programme and interfacing […]

Continue reading