Moree Solar Farm

The 56MW Moree Solar Farm is located in Northern NSW. CATCON was contracted to perform all civil and mechanical works on the 11 month project including; establishment of site compound, upgrade of external road in accordance with the Local Shire requirements, security fencing, construction of all internal roads, construction of substation bench, installation of 32,000 […]

Continue reading

Coonooer Bridge Wind Farm

Located in regional Victoria, this 6 turbine Wind Farm (including Switchyard) was constructed for client and turbine supplier Vestas. The 8 month project involved construction of roads, hardstands, turbine foundations and civil works for the associated switchyard. The remote and rocky location provided a challenging working environment required blasting to break down the medium to […]

Continue reading

Tonsley Forest

The Tonsley Precinct is an urban redevelopment project, revitalising the former Mitsubishi Plant area located in the Southern Suburbs of Adelaide, South Australia. CATCON was contracted to construct the Tonsley Precinct Central Forest – an architectural landscaper’s take on an urban forest. CATCON undertook all earthworks, paving, electrical and landscaping works. Additionally, CATCON also constructed […]

Continue reading

Adelaide Brighton Cement

The Adelaide Brighton Cement Upgrade – Early Works project was located in Birkenhead (Adelaide, South Australia). Early works to existing cement plant include demolition of existing pavements/structures, piling installation (both precast and insitu), bulk earthworks, control of contaminated material, services installation (water, sewer and electrical) and form/reo/pour concrete structures and pavements. Finalising works included pavements […]

Continue reading

Bay River Estate

Bay River Estate was a subdivision project located in Largs North (Adelaide, South Australia) for client Defence Housing Australia. CATCON’s involvement in the project included; installation of sewer main, stormwater, water mains, lot tap connections, CST for service utilities, bitumen to new roads, public street lighting, public parking, exposed aggregate concrete footpaths, residential play area, […]

Continue reading

Rundle Mall Redevelopment

The Rundle Mall was a $30m redevelopment of the main thoroughfare in the heart of Adelaide City, the project commenced in February 2013 and was completed in September 2014. Civil works included; replacing old pavement with new concrete base, installing precast tree pit walls (16), laying granite pavers, installation of new street furniture benches/podiums and […]

Continue reading

Royalla Solar Farm

Royalla Solar Farm project is a solar PV generating facility located near Canberra (ACT). The project involved the construction and commissioning of a 20MWac photovoltaic array plus the associated connections to the ACT power grid and other ancillary infrastructure. CATCON were engaged under a civil, mechanical and electrical scope of works construct only package, responsible […]

Continue reading

Gullen Range Wind Farm

The Gullen Range Wind Farm project was located 40km South West of Goulburn, NSW. The 165MW wind farm consisted of 56 2.5MW Wind Turbine Generators and 17 1.5MW WTG’s CATCON’s scope of work consisted of; 73 no WTG’s bases poured in Pomerroy, Bannister and Gurrundah section of works, WTG ancillary/stair concrete footings to WTG’s, concrete […]

Continue reading

Adelaide Oval

CATCON was involved in the successful and widely critically acclaimed redevelopment of Adelaide Oval (SA). CATCON was contracted to carry out: the bulk excavation of the Southern and Eastern Stands, complete all bulk excavation of stands (200,000m3 total), identification and management of contamination. Northern Bowl; Reshape and detail the Northern end of the spectator seated/standing […]

Continue reading

Snowtown II Wind Farm

The Snowtown Wind Farm Stage II project was located approximately 150km North of Adelaide in South Australia. CATCON was contracted to construct the 90 turbine foundations, hardstands, road network, site compound and substation and control centre civil works. A mix of rock anchor (130m3) and gravity (320m3) footings were used depending on the requirements for […]

Continue reading