Pelican Point Power Station

CATCON were contracted to complete civil works associated with the 500MW combined cycle power  located at Pelican Point, Outer Harbour, South Australia. CACTON provided 6,000m3 of structural concrete elements, including; steam turbine foundation, gas turbine foundations, transformer blast walls and associated structures.

The 8 month project involved adhering to a very tight programme and interfacing with other contractors. CATCON utilised a variety of heavy construction machinery throughout the project, including; Excavators, Cranes, Loaders, Graders and Rollers.