Whitfield Heights

CATCON was contracted by LDI Constructions to develop an exclusive fifteen lot subdivision and associated infrastructure, overlooking Cairns in North Queensland. Infrastructure work included the construction of a lagoon, roadworks, stormwater and water reticulation.

Impressively, the project involved the repair of a 6,000m3 landslip and the construction of a 30m long entrance bridge. The two lane road bridge, constructed of concrete, allows for the flow of water beneath.

Photo Gallery

Posted in Infrastructure.