Layout Main Left
Willunga Basin Pipeline

The 20km Willunga Basin Pipeline was constructed by CATCON for the South Australian Department for Transport, Energy & Infrastructure to provide a waste water solution for the Willunga Basin area south of Adelaide. The 450MPVC pressure pipeline system took 9 months to complete and consists of; 2 pump stations, appurtenances, lined water storage facility and outlet dam.

Construction equipment used included; 30T excavators, loaders, trucks, rollers, graders as well as the Vermeer Rocksaw which was used to cut the trench for the pipeline. CATCON were  required to align the pipeline with the existing road network and farm properties, this required liaising with councils, the DTEI and farm stakeholders.

CATCON performed all structural and mechanical works on the pump stations, including an advance telemetry system. The dam was lined with a bentonite mat layer to prevent seepage. The capacity of the water storage area at the inlet of the project is approximately 10 million litres

Gallery

Deep Trench Dam

pdf Download PDF Fact Sheet

>>Back to Pipelines

Layout Main Right   Layout Right Left
Other Projects

Douglas Mine Water Supply

Baroota Outlet

Coffin Bay Jetty

North Terrace

Layout Right Right
Layout Bottom Left
News

28 Jun 2010 >> CATCON Career Opportunities >> CATCON have been successful in securing new projects and are now hiring. Click he ... [more]

27 Nov 2009 >> Collgar Wind Farm >> CATCON is proud to announce the succesful tender for an EPC civil contract from Vestas for the Collg ... [more]

11 Nov 2009 >> [Careers] New Position Available >> A position description for Project Engineer has been added to the careers section ... [more]

17 Sep 2009 >> [Update] New Project Added >> The Blakes Crossing sub-division project has been added. Click ... [more]

Layout Bottom Right