Catcon Logo
CATCON Contact Details catcon@catcon.com.au
Condamine Power Station
Layout Main Left
Condamine Power Station

CATCON were contracted to supply in-ground structures for all associated plant for the 2 x coal seam gas fired turbines. Additionally all in-ground services provision were supplied and installed by CATCON. System formwork was used for all Gas Turbine Blocks, Steam Turbine Block, HRSG and Diverters. Conventional formwork used for cooling tower, transformer bays, pits and ancillary skids and structures.

Extensive rock quantities in the majority of excavations required the use of a rock-saw and rock breakers. Other equipment used during the project included; Loaders, Rollers and 30 and 20 ton Excavators. Specialist poly weld machines were used for all HDPE pipework in-ground.

Located in Miles (QLD) - 400km’s West of Brisbane, the Condamine site was quite remote and CATCON had to overcome logistics issues by ordering materials well in advance to keep the project on track.

Gallery

Condamine Aerial View Blast Wall Heavy Cranes
Form Work   Oil Retention

pdf Download PDF Fact Sheet

>>Back to Major Infrastructure

Layout Main Right   Layout Right Left
Other Projects

Tallawarra Power Plant

Layout Right Right
Layout Bottom Left
News

28 Jun 2010 >> CATCON Career Opportunities >> CATCON have been successful in securing new projects and are now hiring. Click he ... [more]

27 Nov 2009 >> Collgar Wind Farm >> CATCON is proud to announce the succesful tender for an EPC civil contract from Vestas for the Collg ... [more]

11 Nov 2009 >> [Careers] New Position Available >> A position description for Project Engineer has been added to the careers section ... [more]

17 Sep 2009 >> [Update] New Project Added >> The Blakes Crossing sub-division project has been added. Click ... [more]

Layout Bottom Right